Developing a T-VER project, the project developer must check the size of the project because large projects must undergo verification of additional operations in addition to normal operations (Additionality). Project size is classified according to project type. Details are as follows:

āļŦāļĄāļēāļĒāđāļŦāļāļļ : MW āļāļ·āļ āđāļĄāļāļ°āļ§āļąāļāļāđ, GWh/y āļāļ·āļ āļāļīāļāļ°āļ§āļąāļāļāđ-āļāļąāđāļ§āđāļĄāļāļāđāļāļāļĩ, tCO2eq/year āļāļ·āļ āļāļąāļāļāļēāļĢāđāļāļāļāđāļāļāļāļāđāļāļāđāđāļāļĩāļĒāļāđāļāđāļēāļāđāļāļāļĩ

En
TH 