Project Implementation

  • โปรแกรม: Standard T-VER

Under Premium T-VER, projects can be implemented through three models, as outlined below:
project model

1) Single Project  is a project that carries out GHG emission reduction activities in one location.

2) Bundling Project is a project that carries out the same type of GHG emission reduction activities in several locations with the following requirements:

  • The crediting period of all activities shall be the same.
  • Details of every activity must be specified in the Project Design Document (PDD).

3) Programme of Activities (PoA)

  • All Component Project Activities (CPAs) shall implement the same type of activity and apply the same methodology as specified in the PoA project design.
  • The crediting period of each CPA can be different.
  • The inclusion of additional CPAs shall be within the crediting period of the registered PoA.
  • The total amount of expected GHG emission reductions/removals of all CPAs shall not be more than 60,000 tCO2eq.
  • The size of each CPA shall be a micro-scale project.
  • All CPAs shall monitor greenhouse gas emission reductions using the same procedures as specified in the PoA Design Document.
Image

Publish modules to the "offcanvas" position.