Under Premium T-VER, projects can be implemented through three models, as outlined below:
1) Single Project is a project that carries out GHG emission reduction activities in one location.
2) Bundling Project is a project that carries out the same type of GHG emission reduction activities in several locations with the following requirements:
- The crediting period of all activities shall be the same.
- Details of every activity must be specified in the Project Design Document (PDD).
3) Programme of Activities (PoA)
- All Component Project Activities (CPAs) shall implement the same type of activity and apply the same methodology as specified in the PoA project design.
- The crediting period of each CPA can be different.
- The inclusion of additional CPAs shall be within the crediting period of the registered PoA.
- The total amount of expected GHG emission reductions/removals of all CPAs shall not be more than 60,000 tCO2eq.
- The size of each CPA shall be a micro-scale project.
- All CPAs shall monitor greenhouse gas emission reductions using the same procedures as specified in the PoA Design Document.

En
TH 