Project Specification

Project Implementation

Project Implementation

  • โปรแกรม: Standard T-VER

Under Premium T-VER, projects can be implemented through three models, as outlined below:
project model

1) Single Project  is a project that carries out GHG emission reduction activities in one location.

2) Bundling Project is a project that carries out the same type of GHG emission reduction activities in several locations with the following requirements:

  • The crediting period of all activities shall be the same.
  • Details of every activity must be specified in the Project Design Document (PDD).

3) Programme of Activities (PoA)

  • All Component Project Activities (CPAs) shall implement the same type of activity and apply the same methodology as specified in the PoA project design.
  • The crediting period of each CPA can be different.
  • The inclusion of additional CPAs shall be within the crediting period of the registered PoA.
  • The total amount of expected GHG emission reductions/removals of all CPAs shall not be more than 60,000 tCO2eq.
  • The size of each CPA shall be a micro-scale project.
  • All CPAs shall monitor greenhouse gas emission reductions using the same procedures as specified in the PoA Design Document.
Image

Thailand Greenhouse Gas Management Organization (Public Organization) Address

120 Ratthaprasasanabhakti Building,
9th Fl. The Government Complex Commemorating His Majesty,
Chaeng Wattana Road, Laksi, Bangkok 10210 Thailand
Tel : +66 (0) 2141 9841-9
Fax : +66 (0) 2143 8404
E-Mail : info@tgo.or.th
E-Mail : saraban_tgo@tgo.or.th